P3-coordinated screening-suite graphics for approved suite, door, hallway, or associated-area placements.
Artwork is not required at checkout. Your order confirmation provides the order number used for the later artwork submission.
Add the item to the cart and complete the normal WooCommerce checkout.
Download the exact production template and technical specifications.
The exhibitor's designer completes the artwork outside the website.
Submit the final files through the separate artwork upload portal.
P3-coordinated screening-suite graphics for approved suite, door, hallway, or associated-area placements.
Artwork deadline: January 4, 2027.
Template status: Template supplied after suite and placement review
Images, production templates, and final artwork-upload links will be associated with this product during the asset implementation pass.